Mill Creek Wind Farm
-
LOCATIONOhariu Valley, Wellington
-
PARTNERSHIPMeridian Energy
-
MARKETWind turbines
Project overview
Nexans products and people supported the development of this suburban fringe wind farm project, which was commissioned in 2014.
26 turbines located on hilly terrain near the Ohariu Valley northwest of Wellington's metroplois have the capacity to generate up to 59.8 MW of electricity - enough to power close to 34,000 homes for a year. With a 90% generation rate, the hard-working turbines at this farm required a robust and reliable solution.
Nexans' Key Success Factors
- Technical consultancy with civil and electrical teams
- Ability to overcome difficult terrain / site accessibility
- Limited site storage space required an exacting delivery schedule
- Unique suite of cable design
- Our locality meant reduced wait times and the ability for our sales, technical and engineering teams to conduct site visit's, resulting in a stronger partnership with all involved in the project.
Nexans supplied MV power cables as well as fibre optics and accessories for the complete cable solution.
“ Mill Creek is a fantastic project to have in our wind portfolio. The logistical challenges of this project have really given us some good insight into how to provide the best service solution for wind farm development. Partnering with Meridian Energy again has really ensured continuity and a strengthened business relationship for both parties. ”
Mark Williams
Nexans’ National Key Account Manager100%
of cable supplied by Nexans
26
turbines generating 59.8MW of power
Our websites
Select your country to find our products and solutions
-
Africa
- Africa
- Ghana
- Ivory Coast
- Morocco
- North West Africa
- Americas
- Asia
- Europe
- Oceania